傻大方


首页 > 学习 >

合理|合理生产线库存及仓库库存(DFT)

傻大方摘要:【合理|合理生产线库存及仓库库存(DFT)|生产线|库存|仓库|DFT】2、ivery Multek95100% Topsearch8090% Cycle time Multek168hrs for normal 2+4+2 HDI projects Topsearch? 2) PE: 制定OMS, 并对OMS进行全面布置 3) PROD: 负责执行DFT并反馈相关信息 OMS: Operational Method Sheet Kanban size 指工...



按关键词阅读: 生产线 仓库 合理 DFT 库存

1、DFT is a mathematical based flow manufacturing technique. It utilizes a demand pull technique to communicate demand-to-build and demand-to-pull material to replace that consumed by already completed products. It is a pull process, pulled from the back, or the completion , of the product. On Time Del 。

2、ivery Multek95100% Topsearch8090% Cycle time Multek168hrs for normal 2+4+2 HDI projects Topsearch? 2) PE: 制定OMS, 并对OMS进行全面布置 3) PROD: 负责执行DFT并反馈相关信息 OMS: Operational Method Sheet Kanban size 指工序与工序之间或岗位与岗位之间半成品或物料数量的最大值. 半成品或物料数量不能超过Kanban数 下工序(或岗位) Kanban满时, 本工序(或岗位)停做 先进先出, 即先做的那块(或LOT)板一定要先出 PPC负 。

【合理|合理生产线库存及仓库库存(DFT)】3、责对生产部执行DFT的情况进行监督, 并不定时检查. 监督的具体内容: 半成品和物料摆放位置是否整齐 数量与所规定的Kanban数量是否相符 实际操作与要求是否相符 不符合处不符合处, PPC有权要求生产部必须改正有权要求生产部必须改正. 如果生产工艺有改变或者设备有增减时, 相关部门要积极 配合PPC及时 Arrangement of IPK on shop floor Kanban Card: The kanban signal can be a card with the following information DFT对全面质量控制非常重视. 事实上实行DFT后, WIP会大量减少, 。

4、 生产线上任何质量问题将可能导致全线停产. 为了控制质量, DFT使用了OMS. OMS原则上是员工日常工作的指引. 针对工作性质, 将工作分为三部分: Steps Symbol Color Code TQC Check the previous operation or incoming material Work Content Content of the work you are supposed to perform on the unit Verify After completing the work content,check to ensure its good Red Ye 。

5、llow Blue Format: TQC Work Content Verify TQC Basic Concepts: Continuous improvement. TQC attempts to build quality not only into product or process, but also instill discipline upon the people. The heart of TQC is essentially “built in quality” through self inspection. In the TQC process, problems。

6、are found right at the source. Problems are detected real time, so avoiding potential rework. The area of inspection is small enough for each Operator to cover with a high level of certainty. When repeated errors are found, manufacturing is immediately stopped to find the root cause. DFT Manufacturi 。

7、ngTraditional Manufacturing Implemented at the point where work content is performed Implemented as quality inspection for finished goods One unit at a time reduces Quality risk Batch Inspection increases Quality risk TQC information in SOE (sequence of events) TQC information hard to access Graphic 。

8、al work instructions directly located where work is performed Work instructions may be centralized ABCDEFG Name Bob Sharon Julie Vince Joe Susan Fred LINE OPERATIONS Permanent Certified Operation Certified one up / one down Under training one up / one down All Operators should be trained at minimum of “1 up / 1 down” from their own position. This keeps products moving down the line at all times. A training matrix can be kept for each product. It should show all operations & each Operator certified (or under training) for that operation: 温馨提示: 本PPT课件下载后 , 即可编辑修改 ,也可直接使用 。
(希望本课件对您有所帮助) 。


    稿源:(未知)

    【傻大方】网址:/a/2021/0816/0023746149.html

    标题:合理|合理生产线库存及仓库库存(DFT)


    上一篇:作文|我的苦与乐作文600字

    下一篇:混凝土|混凝土施工记录表格讲课讲稿